{"id":886,"date":"2019-03-19T11:55:56","date_gmt":"2019-03-19T11:55:56","guid":{"rendered":"https:\/\/www.bowthorpehouse.com\/?p=886"},"modified":"2019-03-29T22:29:03","modified_gmt":"2019-03-29T22:29:03","slug":"ground-works-in-progress","status":"publish","type":"post","link":"https:\/\/www.bowthorpehouse.com\/?p=886","title":{"rendered":"Ground Works in Progress"},"content":{"rendered":"\n<p>Bowthorpe House are pleased to report a great start to the ground works on our latest site.&nbsp; Taking advantage of the fine weather conditions, full strip of the vegetation and subsequent top soil has been achieved in a week which has positioned us ahead of schedule.<\/p>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter\"><img loading=\"lazy\" width=\"560\" height=\"392\" src=\"https:\/\/www.bowthorpehouse.com\/wp-content\/uploads\/2019\/03\/image.jpg\" alt=\"\" class=\"wp-image-888\" srcset=\"https:\/\/www.bowthorpehouse.com\/wp-content\/uploads\/2019\/03\/image.jpg 560w, https:\/\/www.bowthorpehouse.com\/wp-content\/uploads\/2019\/03\/image-300x210.jpg 300w\" sizes=\"(max-width: 560px) 100vw, 560px\" \/><figcaption>View from the South West corner of the site.<\/figcaption><\/figure><\/div>\n\n\n\n<p> Removal of top soil is well underway exporting it to a hired field nearby, with over 160 lorry loads already removed. Over the coming days this will be completed, leaving a clear site for all foundations to be dug out. <\/p>\n\n\n\n<div class=\"wp-block-image\"><figure class=\"aligncenter\"><img src=\"https:\/\/www.bowthorpehouse.com\/wp-content\/uploads\/2019\/03\/image-1-1.jpg\" alt=\"\" class=\"wp-image-895\"\/><figcaption>Plot 1 Foundation Progress<\/figcaption><\/figure><\/div>\n\n\n\n<p>The foundations for Plot 1 have been already excavated and concreted. The plan is to work around the\nsite in an anticlockwise direction completing all foundations shortly.\n <\/p>\n\n\n\n<p>We will shortly present selective\nplots to the market however we have already received serious interest. <\/p>\n","protected":false},"excerpt":{"rendered":"<p>Bowthorpe House are pleased to report a great start to the ground works on our latest site.&nbsp; Taking advantage of the fine weather conditions, full strip of the vegetation and subsequent top soil has been achieved in a week which has positioned us ahead of schedule. Removal of top soil is well underway exporting it [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":890,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[17,1],"tags":[],"_links":{"self":[{"href":"https:\/\/www.bowthorpehouse.com\/index.php?rest_route=\/wp\/v2\/posts\/886"}],"collection":[{"href":"https:\/\/www.bowthorpehouse.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.bowthorpehouse.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.bowthorpehouse.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.bowthorpehouse.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=886"}],"version-history":[{"count":4,"href":"https:\/\/www.bowthorpehouse.com\/index.php?rest_route=\/wp\/v2\/posts\/886\/revisions"}],"predecessor-version":[{"id":897,"href":"https:\/\/www.bowthorpehouse.com\/index.php?rest_route=\/wp\/v2\/posts\/886\/revisions\/897"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.bowthorpehouse.com\/index.php?rest_route=\/wp\/v2\/media\/890"}],"wp:attachment":[{"href":"https:\/\/www.bowthorpehouse.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=886"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.bowthorpehouse.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=886"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.bowthorpehouse.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=886"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}